STATION 2 · Q8
Station 2, Task 8: assembly of a Wh, varh, PF, V and A monitoring panel for a three-phase three-wire load (simulated high-voltage load with PTs and CTs)
This page covers the sequence of operation, the time limit and the materials of Station 2 (Task 8: Wh, varh, PF, V, A monitoring panel) of the Taiwan Level B interior wiring technician practical exam. On this site you can practice wiring, crimping and a test run in the browser following the circuit diagram and the arrangement drawing, with automatic grading against the assessment sheet.

Sequence of operation (動作說明)
Assemble a monitoring panel for a three-phase three-wire 10 kVA load: two potential transformers (PT, V-V connection) and two through-type current transformers (CT) feed the watt-hour meter, the var-hour meter and the power factor meter, and the voltmeter and ammeter are connected through the voltmeter selector switch VS and the ammeter selector switch AS.
- 1Power on
The watt-hour meter and var-hour meter turn forward.
- 2VS and AS at OFF
The voltmeter and ammeter read zero.
- 3Switch VS and AS to each phase
The voltmeter and ammeter read the voltage and current of that phase.
Workmanship rules
The potential transformer circuit uses 2 mm² red wire, the current transformer circuit 2 mm² black and the main circuit 8 mm² black; the number of turns through each CT is calculated to match the ammeter. The leads of VS and AS are unmarked, so identify them yourself with a multimeter. In this task every wire end a candidate makes needs a crimp terminal, and candidates also wire the U-shaped hinge loop between the enclosure body and the enclosure door (TB3 ↔ TB4).
Time limit and materials
Time limit: 90 min
Wire and crimp terminals issued to candidates
From the official list of materials issued to candidates; the test site gives more when you run out.
| Name | Specification | Quantity |
|---|---|---|
| PVC-insulated wire | 600V, 2mm², red | 10 m |
| PVC-insulated wire | 600V, 2mm², black | 10 m |
| PVC-insulated wire | 600V, 8mm², black | 3 m |
| PVC-insulated wire | 600V, 5.5mm², green | 2 m |
| PVC-insulated wire | 600V, 2mm², green | 2 m |
| Crimp terminal | 5.5mm²-5, "O" | 12 pcs |
| Crimp terminal | 2mm²-5, "O" | 2 pcs |
| Crimp terminal | 2mm²-4, "Y" | 100 pcs |
| Crimp terminal | 5.5mm²-5, "Y" | 6 pcs |
| Crimp terminal | 8mm²-5, "Y" | 6 pcs |
Devices installed at the test site
| Name | Specification | Quantity |
|---|---|---|
| Molded-case circuit breaker | 3P, 220V, 50AF, 50AT, IC5kA | 1 pcs |
| AC voltmeter | panel-mount, coil 150V, scale 0-300V | 1 pcs |
| AC ammeter | panel-mount, AC 0-5A, scale 0-50A | 1 pcs |
| D-type fuse | 500V, 2A, with fuse base | 3 pcs |
| Voltmeter selector switch | 3φ3W 250VAC, 10A, with sealed enclosure | 1 pcs |
| Ammeter selector switch | 3φ3W 250VAC, 10A, with sealed enclosure | 1 pcs |
| Potential transformer | 1φ 220/110V, 100VA | 2 pcs |
| Current transformer | 50/5A 15VA | 2 pcs |
| Watt-hour meter | 3φ3W, 110V/5A | 1 pcs |
| Var-hour meter | 3φ3W, 110V/5A | 1 pcs |
| Power factor meter | 3φ3W, 110V/5A, balanced | 1 pcs |
| Terminal block | 3P, 600V, 50A | 2 pcs |
| Terminal block | 4P, 600V, 50A | 1 pcs |
| Terminal block | 6P, 600V, 20A | 3 pcs |
| Terminal block | 10P, 600V, 20A | 3 pcs |
| Terminal block | 20P, 600V, 20A | 2 pcs |
| Terminal block | 4P, 600V, 20A | 1 pcs |
| Main ground bar (接地極端子板) | copper, 4P | 1 pcs |
| Equipment ground bar (接地線端子板) | copper, 5P | 1 pcs |
| Three-phase load | 10kVA (candidate workstation equipment; LOAD in the circuit diagram) | 1 unit |
Practicing this task here
New devices in Task 8: potential transformers PT (220/110V, two in V-V connection, + terminal first), through-type current transformers CT (50/5A, nameplate 2 turns: when wiring a main circuit wire, click the start → the CT window → choose the turns → the end; the side you start from is the K side. You can also select the wire later and change it in the "Wiring" tab), watt-hour meter, var-hour meter (terminals 1S P1 P3 3S 3L P2 1L), power factor meter, voltmeter and ammeter; device leads are pre-wired to the terminal blocks, and you wire between the terminal blocks; there is no door-crossing harness, so wire the U-shaped hinge loop (U 形過門線) TB3 ↔ TB4 yourself. VS and AS come in a sealed enclosure with unmarked leads: turn on the multimeter in the "Wiring" tab (no need to energize), click the knob to change position and measure TB9 and TB10 on the ohms range to identify them; you can also open the lead identification bench from the realistic mode card and label the leads once identified (not graded).
Open the simulator, pick this task and click terminals to wire it (normal mode routes wires automatically; in realistic mode you strip the wires, crimp the terminals and pull the wires into the wiring duct yourself). When you are done, switch to test run and operate it with power on, then submit for grading: the assessment sheet lists the demerits and where they are.
Full instructions: How to use
Practice this task →