Station 2, Task 7: automatic transfer control circuit for normal supply and standby supply

This page covers the sequence of operation, the time limit and the materials of Station 2 (Task 7: normal/standby supply automatic transfer) of the Taiwan Level B interior wiring technician practical exam. On this site you can practice wiring, crimping and a test run in the browser following the circuit diagram and the arrangement drawing, with automatic grading against the assessment sheet.

The panel of Task 7: normal/standby supply automatic transfer with the reference solution wired: the control box, the enclosure door and the wires
The panel of Task 7: normal/standby supply automatic transfer (reference solution)

Sequence of operation (動作說明)

  1. 1
    The normal supply (utility supply) comes on

    TR2 times out and, through X2, the automatic transfer switch ATS transfers to the normal side; the W lamp lights.

  2. 2
    The normal supply fails for longer than the TR1 setting

    Y2 lights to call for the generator.

  3. 3
    The standby supply (generator) comes on

    TR4 times out and, through X3, ATS transfers to the standby side; the R lamp lights.

  4. 4
    The normal supply returns

    ATS transfers back to the normal side, and Y2 goes out after TR3 times out.

Workmanship rules

Y1 lights while the ATS is transferring. The devices and wiring of the ATS panel are pre-wired at the test site; candidates wire the control circuit of the control box and its door (1.25 mm² yellow) and two ground wires (3.5 mm² green).

Time limit and materials

Time limit: 90 min

Wire and crimp terminals issued to candidates

From the official list of materials issued to candidates; the test site gives more when you run out.

NameSpecificationQuantity
PVC-insulated wire600V, 1.25mm², yellow1 roll
PVC-insulated wire600V, 3.5mm², green1 m
Crimp terminal1.25mm²-4, "Y"50 pcs
Crimp terminal3.5mm²-5, "O"8 pcs
Devices installed at the test site
NameSpecificationQuantity
Molded-case circuit breaker3P, 220V, 50AF, 30AT, IC5kA2 pcs
D-type fuse500V, 2A, with fuse base5 pcs
Auxiliary relayAC 220V, 5A, 2C, with socket4 pcs
Time-delay relayAC 220V, 0-10sec, 1c, OFF DELAY, with socket1 pcs
Time-delay relayAC 220V, 0-30sec, 1c, ON DELAY, with socket2 pcs
Time-delay relayAC 220V 0-5min, 1c, ON DELAY, with socket1 pcs
Indicator light (white)AC 220V/15V, 18V bulb, 30mmφ1 pcs
Indicator light (red)AC 220V/15V, 18V bulb, 30mmφ1 pcs
Indicator light (yellow)AC 220V/15V, 18V bulb, 30mmφ2 pcs
Terminal block3P, 600V, 30A2 pcs
Terminal block16P, 600V, 20A4 pcs
Automatic transfer switch3P, 600V, 100A, with electrical and mechanical interlocks and manual operating handle, 470mmW×220mmL×210mmH1 set
Main ground bar (接地極端子板)copper, 4P2 pcs
Equipment ground bar (接地線端子板)copper, 5P2 pcs

Practicing this task here

New devices in Task 7: the ATS panel (right column) is fully pre-wired; its leads run via TB2 → control box TB1. When the ATS transfer motor TM is energized, it moves to the other side; on arrival, limit switches LSA (normal side) and LSB (standby side) operate and cut TM off (c-a closes, c-b opens). TR2, TR3 and TR4 are on-delay relays (same pinout as the off-delay relay: ②⑦ supply, ⑧ common, ⑥ time-delay a, ⑤ time-delay b; they time while energized, operate when the time is up and reset immediately when de-energized); TR1 is an off-delay relay. For the test run, operate NFB1 (normal supply) and NFB2 (standby supply = generator) as in work instructions (實作說明) item (5); Y2 lit means the generator should run; click the ATS manual operating handle to move it to the other side (while TM is de-energized).

Open the simulator, pick this task and click terminals to wire it (normal mode routes wires automatically; in realistic mode you strip the wires, crimp the terminals and pull the wires into the wiring duct yourself). When you are done, switch to test run and operate it with power on, then submit for grading: the assessment sheet lists the demerits and where they are.