Taiwan Level B Interior Wiring Station 2 Simulator

STATION 2 · Q6

Station 2, Task 6: gate control circuit

This page covers the sequence of operation, the time limit and the materials of Station 2 (Task 6: gate control circuit) of the Taiwan Level B interior wiring technician practical exam. On this site you can practice wiring, crimping and a test run in the browser following the circuit diagram and the arrangement drawing, with automatic grading against the assessment sheet.

The panel of Task 6: gate control circuit with the reference solution wired: the control box, the enclosure door and the wires
The panel of Task 6: gate control circuit (reference solution)

Sequence of operation (動作說明)

A single-phase capacitor-start motor opens and closes the gate: MCF opens it, MCR closes it.

  1. 1
    Someone passes the through-beam photoelectric switch PH1 outside the gate from outside to inside (beam blocked)

    MCF opens the gate, and the time-delay relays TR1 and TR3 time out in turn and reset.

  2. 2
    The gate is fully open and presses the limit switch LS1

    Opening stops and TR5 starts timing.

  3. 3
    TR5 times out

    MCR closes the gate automatically until it presses LS2.

  4. 4
    Someone passes PH2 inside the gate from inside to outside

    The gate opens and closes the same way (TR2, TR4).

  5. 5
    Someone passes while the gate is closing

    It stops closing and opens again.

Workmanship rules

There is also an emergency stop button EMS and TH-RY overload protection; the photoelectric switches are supplied from before EMS. The supply is single-phase two-wire 220V and the main circuit is pre-wired at the test site; candidates wire the control circuit (1.25 mm² yellow) and the ground wires (2 mm² green).

Time limit and materials

Time limit: 90 min

Wire and crimp terminals issued to candidates

From the official list of materials issued to candidates; the test site gives more when you run out.

NameSpecificationQuantity
PVC-insulated wire600V, 1.25mm², yellow1 roll
PVC-insulated wire600V, 2mm², green1 m
Crimp terminal1.25mm²-4, "Y"50 pcs
Crimp terminal2mm²-5, "O"6 pcs
Devices installed at the test site
NameSpecificationQuantity
Mounting board900×600×1.6tmm, painted steel1 pcs
Molded-case circuit breaker2P, 220V, 50AF, 15AT, IC5kA1 pcs
D-type fuse500V, 2A, with fuse base2 pcs
ContactorAC 1φ 220V 2.2kW(3HP), coil 220V, 3P, auxiliary contacts 2a2b, 2 units, reversing, mechanical interlock1 set
Photoelectric switchinfrared, AC 220V, contact 1c, through-beam, with emitter and receiver2 set
Limit switch1a1b, 10A, 250V, plunger type2 pcs
Emergency stop pushbutton (red)30mmφ, 600V, 1a1b, push-lock, red, maintained1 pcs
Thermal overload relay6.8A, adjustable, 2-heater1 pcs
Auxiliary relayAC 220V, 5A, 2C, with socket2 pcs
Auxiliary relayAC 220V, 5A, 3c, with socket2 pcs
Time-delay relayAC 220V, 0-10sec, time-delay contact 1c, instantaneous contact 1a, ON Delay, with socket5 pcs
Indicator light (red)AC 220V/15V, 18V bulb, 30mmφ2 pcs
Indicator light (yellow)AC 220V/15V, 18V bulb, 30mmφ2 pcs
Terminal block3P, 600V, 20A1 pcs
Terminal block4P, 600V, 20A1 pcs
Terminal block16P, 600V, 20A2 pcs
Terminal block10P, 600V, 20A1 pcs
Main ground bar (接地極端子板)copper, 4P1 pcs
Equipment ground bar (接地線端子板)copper, 5P1 pcs
Single-phase induction motor1φ 110V/220V 3/4HP, with electromagnetic brake (a standard motor may be used at the test site)1 unit

Practicing this task here

New devices in Task 6: through-beam photoelectric switches PH1 (outside the gate) and PH2 (inside) (emitter+receiver, AC 220V, 1c output, c–a closes when the beam is blocked; mounted on the mounting board outside the box, leads pre-wired to TB5); TR1–TR5 are on-delay relays (②⑦ supply, ⑧ common, ⑥ time-delay a, ⑤ time-delay b; TR1 and TR2 also have instantaneous contacts ①c ③a ④b, while on TR3–TR5 ①c ③a ④b is a second time-delay contact); X3 and X4 are 11-pin 3c auxiliary relays (②⑩ coil, ①c ④a ⑤b, ③c ⑥a ⑦b, ⑪c ⑨a ⑧b); LS1 and LS2 are limit switches on the back of the enclosure door (pressed by hand); the motor is a single-phase capacitor-start motor (MCF and MCR switch the auxiliary winding → open, close the gate). During the test run, click a photoelectric switch beam to block it (someone passing); the limit switches can be held down or pressed once.

Open the simulator, pick this task and click terminals to wire it (normal mode routes wires automatically; in realistic mode you strip the wires, crimp the terminals and pull the wires into the wiring duct yourself). When you are done, switch to test run and operate it with power on, then submit for grading: the assessment sheet lists the demerits and where they are.

Full instructions: How to use

Practice this task →