Taiwan Level B Interior Wiring Station 2 Simulator

STATION 2 · Q3

Station 2, Task 3: two water pumps, manual/auto alternating operation control circuit

This page covers the sequence of operation, the time limit and the materials of Station 2 (Task 3: two water pumps, manual/auto alternating operation) of the Taiwan Level B interior wiring technician practical exam. On this site you can practice wiring, crimping and a test run in the browser following the circuit diagram and the arrangement drawing, with automatic grading against the assessment sheet.

The panel of Task 3: two water pumps, manual/auto alternating operation with the reference solution wired: the control box, the enclosure door and the wires
The panel of Task 3: two water pumps, manual/auto alternating operation (reference solution)

Sequence of operation (動作說明)

Two water pumps fill the rooftop water tank, operated manually or automatically; on auto the two pumps alternate.

  1. 1
    Turn COS to manual (M)

    ON1/OFF1 and ON2/OFF2 start and stop the two water pumps separately; the two are interlocked.

  2. 2
    Turn COS to auto (A) with the rooftop water tank low

    The conductive level controller 61F-G senses the level and one pump runs.

  3. 3
    The water reaches E1

    The pump stops and the ratchet relay MR switches once.

  4. 4
    The water is low again

    The other pump runs.

  5. 5
    The supply tank is empty (float switch FS open)

    No pump runs.

Workmanship rules

Indicator lamps: RL1 and RL2 pump running, GL1 tank full, GL2 both stopped; the buzzer sounds on TH-RY overload. The dashed lines TB1 → NFB, MC → TH-RY and terminal block → motor on the circuit diagram are pre-wired at the test site; candidates wire the main circuit from NFB to MC and from TH-RY to the terminal blocks (3.5 mm² black), the control circuit (1.25 mm² yellow) and the ground wires; E3 of the 61F-G must also be grounded.

Time limit and materials

Time limit: 90 min

Wire and crimp terminals issued to candidates

From the official list of materials issued to candidates; the test site gives more when you run out.

NameSpecificationQuantity
PVC-insulated wire600V, 1.25mm², yellow1 roll
PVC-insulated wire600V, 3.5mm², black5 m
PVC-insulated wire600V, 2mm², green1.5 m
PVC-insulated wire600V, 3.5mm², green1 m
Crimp terminal1.25mm²-4, "Y"50 pcs
Crimp terminal3.5mm²-5, "Y"30 pcs
Crimp terminal2mm²-5, "O"4 pcs
Crimp terminal3.5mm²-5, "O"6 pcs
Devices installed at the test site
NameSpecificationQuantity
Molded-case circuit breaker3P, 220V, 50AF, 30AT, IC10kA1 pcs
D-type fuse500V, 2A, with fuse base2 pcs
Motor starterAC 220V 3.7kW(5HP), coil 220V 3P, auxiliary contacts 2a2b, with 15A adjustable 2-heater thermal overload relay2 pcs
Thermal overload relay (starter-mounted)15A, adjustable, 2-heater2 pcs
Auxiliary relayAC 220V, 5A, 2C, with socket1 pcs
Ratchet relayAC 220V, 5A, 2C, with socket1 pcs
Pushbutton switch (green)30mmφ, 600V, 1a1b2 pcs
Pushbutton switch (red)30mmφ, 600V, 1a1b2 pcs
Selector switch30mmφ, 1a1b, 600V, maintained, 2-position1 pcs
Float switch110-220V 1HP, 1a1b, two-float1 pcs
Indicator light (red)AC 220V/15V, 18V bulb, 30mmφ2 pcs
Indicator light (green)AC 220V/15V, 18V bulb, 30mmφ2 pcs
Conductive level controllerAC 220V, single-circuit type, with electrode rods1 set
Electrode rodE1, E2, E3 (supplied with the conductive level controller)1 set
BuzzerAC 220V, 30mmφ, flush-mount1 pcs
Terminal block3P, 600V, 30A1 pcs
Terminal block4P, 600V, 30A2 pcs
Terminal block8P, 600V, 20A2 pcs
Terminal block16P, 600V, 20A2 pcs
Main ground bar (接地極端子板)copper, 4P1 pcs
Equipment ground bar (接地線端子板)copper, 5P1 pcs
Three-phase induction motor5HP, 3 leads (candidate workstation equipment)2 unit

Practicing this task here

New devices in Task 3: X (auxiliary relay) and MR (ratchet relay: toggles on each energization and stays put when de-energized) are 8-pin 2c (②⑦ coil, ① common ③ a ④ b, ⑧ common ⑥ a ⑤ b); the 61F-G conductive level controller socket is pre-wired to TB7; it operates when the water reaches E1 (Tc-Ta closes) and resets only below E2; E3 needs its own ground (2 mm² green wire); click COS to switch M (manual) / A (auto). In the test run controls you can set the rooftop water tank level, water use and whether the supply tank has water (at the test site, E1 and E3 are shorted/opened by hand).

Open the simulator, pick this task and click terminals to wire it (normal mode routes wires automatically; in realistic mode you strip the wires, crimp the terminals and pull the wires into the wiring duct yourself). When you are done, switch to test run and operate it with power on, then submit for grading: the assessment sheet lists the demerits and where they are.

Full instructions: How to use

Practice this task →