STATION 2 · Q5
Station 2, Task 5: punch press automatic counting and DC injection braking control circuit
This page covers the sequence of operation, the time limit and the materials of Station 2 (Task 5: punch press automatic counting and DC injection braking) of the Taiwan Level B interior wiring technician practical exam. On this site you can practice wiring, crimping and a test run in the browser following the circuit diagram and the arrangement drawing, with automatic grading against the assessment sheet.

Sequence of operation (動作說明)
- 1Press ON
MC operates, the motor runs and the red lamp lights.
- 2Press the limit switch LS once
The counter counts one.
- 3Press OFF, reach the count setting, or TH-RY trips on overload
MC releases and MCB operates, feeding DC from the transformer and rectifier (Tr & REC) into the motor windings for DC injection braking; the yellow lamp lights.
- 4TR1 times out
Braking ends.
- 5After stopping at the count setting, TR2 times out
The counter resets.
- 6TH-RY overload
The buzzer sounds.
Workmanship rules
The motor main circuit is pre-wired at the test site. Candidates wire the line side of the transformer (3.5 mm² black), the DC injection braking main circuit (3.5 mm² blue; both in the wiring duct), the control circuit (1.25 mm² yellow) and the ground wires; during braking, a DC voltage must be measurable between phases R and T of TB2.
Time limit and materials
Time limit: 90 min
Wire and crimp terminals issued to candidates
From the official list of materials issued to candidates; the test site gives more when you run out.
| Name | Specification | Quantity |
|---|---|---|
| PVC-insulated wire | 600V, 1.25mm², yellow | 1 roll |
| PVC-insulated wire | 600V, 3.5mm², black | 2 m |
| PVC-insulated wire | 600V, 3.5mm², blue | 4.5 m |
| PVC-insulated wire | 600V, 2mm², green | 1 m |
| Crimp terminal | 1.25mm²-4, "Y" | 50 pcs |
| Crimp terminal | 2mm²-5, "O" | 4 pcs |
| Crimp terminal | 3.5mm²-5, "Y" | 20 pcs |
Devices installed at the test site
| Name | Specification | Quantity |
|---|---|---|
| Molded-case circuit breaker | 3P, 220V, 50AF, 20AT, IC5kA | 1 pcs |
| D-type fuse | 500V, 10A, with fuse base | 1 pcs |
| D-type fuse | 500V, 2A, with fuse base | 3 pcs |
| Contactor | AC 220V 2.2kW(3HP), coil 220V 3P, auxiliary contacts 2a2b | 2 pcs |
| Time-delay relay | AC 220V, 0-30sec, 1c, ON DELAY, with socket | 2 pcs |
| Auxiliary relay | AC 220V, 5A, 2C, with socket | 2 pcs |
| Thermal overload relay | 10A, adjustable, 2-heater | 1 pcs |
| Pushbutton switch (green) | 30mmφ, 600V, 1a1b | 1 pcs |
| Pushbutton switch (red) | 30mmφ, 600V, 1a1b | 1 pcs |
| Limit switch | 1a1b, 10A, 250V, plunger type | 1 pcs |
| Bridge rectifier | 10A, 100V | 1 pcs |
| Transformer | AC 220V/24V, 300VA | 1 pcs |
| Counter | AC 220V, 30CPS, external reset, control contact 1c | 1 pcs |
| Indicator light (red) | AC 220V/15V, 18V bulb, 30mmφ | 1 pcs |
| Indicator light (yellow) | AC 220V/15V, 18V bulb, 30mmφ | 1 pcs |
| Buzzer | AC 220V, 30mmφ, flush-mount | 1 pcs |
| Terminal block | 3P, 600V, 20A | 3 pcs |
| Terminal block | 4P, 600V, 20A | 1 pcs |
| Terminal block | 16P, 600V, 20A | 2 pcs |
| Main ground bar (接地極端子板) | copper, 4P | 1 pcs |
| Equipment ground bar (接地線端子板) | copper, 5P | 1 pcs |
| Three-phase induction motor | 3HP, 3 leads (candidate workstation equipment) | 1 unit |
Practicing this task here
New devices in Task 5: TR1 and TR2 are on-delay relays (②⑦ supply, ⑧ common, ⑥ time-delay a, ⑤ time-delay b; they time while energized and reset immediately when de-energized); the COUNTER (8-pin; its leads run to the small 8P terminal block below, each position printed with its function: +12V, CNT (COUNT IN), RST (RESET IN), 220V, 0V, c, a, b; the pinout is unconfirmed, so follow the reference drawing at the test site) counts 1 per LS press and operates its output at the preset; connecting +12V to RESET IN resets it to zero; LS is a plunger-type limit switch (NC, NO, COM). Tr & REC (transformer+bridge rectifier) is pre-wired to TB6 and TB5; use blue wire for the DC injection braking main circuit and black wire for the transformer line side, both in the wiring duct. During the test run, click the LS plunger on the panel or "Tap LS" to count, and use ▼▲ on the counter to change the preset; switch the multimeter (in the "Wiring" tab) to "V⎓" to measure phases R and T at TB2.
Open the simulator, pick this task and click terminals to wire it (normal mode routes wires automatically; in realistic mode you strip the wires, crimp the terminals and pull the wires into the wiring duct yourself). When you are done, switch to test run and operate it with power on, then submit for grading: the assessment sheet lists the demerits and where they are.
Full instructions: How to use
Practice this task →