Taiwan Level B Interior Wiring Station 2 Simulator

STATION 2 · Q5

Station 2, Task 5: punch press automatic counting and DC injection braking control circuit

This page covers the sequence of operation, the time limit and the materials of Station 2 (Task 5: punch press automatic counting and DC injection braking) of the Taiwan Level B interior wiring technician practical exam. On this site you can practice wiring, crimping and a test run in the browser following the circuit diagram and the arrangement drawing, with automatic grading against the assessment sheet.

The panel of Task 5: punch press automatic counting and DC injection braking with the reference solution wired: the control box, the enclosure door and the wires
The panel of Task 5: punch press automatic counting and DC injection braking (reference solution)

Sequence of operation (動作說明)

  1. 1
    Press ON

    MC operates, the motor runs and the red lamp lights.

  2. 2
    Press the limit switch LS once

    The counter counts one.

  3. 3
    Press OFF, reach the count setting, or TH-RY trips on overload

    MC releases and MCB operates, feeding DC from the transformer and rectifier (Tr & REC) into the motor windings for DC injection braking; the yellow lamp lights.

  4. 4
    TR1 times out

    Braking ends.

  5. 5
    After stopping at the count setting, TR2 times out

    The counter resets.

  6. 6
    TH-RY overload

    The buzzer sounds.

Workmanship rules

The motor main circuit is pre-wired at the test site. Candidates wire the line side of the transformer (3.5 mm² black), the DC injection braking main circuit (3.5 mm² blue; both in the wiring duct), the control circuit (1.25 mm² yellow) and the ground wires; during braking, a DC voltage must be measurable between phases R and T of TB2.

Time limit and materials

Time limit: 90 min

Wire and crimp terminals issued to candidates

From the official list of materials issued to candidates; the test site gives more when you run out.

NameSpecificationQuantity
PVC-insulated wire600V, 1.25mm², yellow1 roll
PVC-insulated wire600V, 3.5mm², black2 m
PVC-insulated wire600V, 3.5mm², blue4.5 m
PVC-insulated wire600V, 2mm², green1 m
Crimp terminal1.25mm²-4, "Y"50 pcs
Crimp terminal2mm²-5, "O"4 pcs
Crimp terminal3.5mm²-5, "Y"20 pcs
Devices installed at the test site
NameSpecificationQuantity
Molded-case circuit breaker3P, 220V, 50AF, 20AT, IC5kA1 pcs
D-type fuse500V, 10A, with fuse base1 pcs
D-type fuse500V, 2A, with fuse base3 pcs
ContactorAC 220V 2.2kW(3HP), coil 220V 3P, auxiliary contacts 2a2b2 pcs
Time-delay relayAC 220V, 0-30sec, 1c, ON DELAY, with socket2 pcs
Auxiliary relayAC 220V, 5A, 2C, with socket2 pcs
Thermal overload relay10A, adjustable, 2-heater1 pcs
Pushbutton switch (green)30mmφ, 600V, 1a1b1 pcs
Pushbutton switch (red)30mmφ, 600V, 1a1b1 pcs
Limit switch1a1b, 10A, 250V, plunger type1 pcs
Bridge rectifier10A, 100V1 pcs
TransformerAC 220V/24V, 300VA1 pcs
CounterAC 220V, 30CPS, external reset, control contact 1c1 pcs
Indicator light (red)AC 220V/15V, 18V bulb, 30mmφ1 pcs
Indicator light (yellow)AC 220V/15V, 18V bulb, 30mmφ1 pcs
BuzzerAC 220V, 30mmφ, flush-mount1 pcs
Terminal block3P, 600V, 20A3 pcs
Terminal block4P, 600V, 20A1 pcs
Terminal block16P, 600V, 20A2 pcs
Main ground bar (接地極端子板)copper, 4P1 pcs
Equipment ground bar (接地線端子板)copper, 5P1 pcs
Three-phase induction motor3HP, 3 leads (candidate workstation equipment)1 unit

Practicing this task here

New devices in Task 5: TR1 and TR2 are on-delay relays (②⑦ supply, ⑧ common, ⑥ time-delay a, ⑤ time-delay b; they time while energized and reset immediately when de-energized); the COUNTER (8-pin; its leads run to the small 8P terminal block below, each position printed with its function: +12V, CNT (COUNT IN), RST (RESET IN), 220V, 0V, c, a, b; the pinout is unconfirmed, so follow the reference drawing at the test site) counts 1 per LS press and operates its output at the preset; connecting +12V to RESET IN resets it to zero; LS is a plunger-type limit switch (NC, NO, COM). Tr & REC (transformer+bridge rectifier) is pre-wired to TB6 and TB5; use blue wire for the DC injection braking main circuit and black wire for the transformer line side, both in the wiring duct. During the test run, click the LS plunger on the panel or "Tap LS" to count, and use ▼▲ on the counter to change the preset; switch the multimeter (in the "Wiring" tab) to "V⎓" to measure phases R and T at TB2.

Open the simulator, pick this task and click terminals to wire it (normal mode routes wires automatically; in realistic mode you strip the wires, crimp the terminals and pull the wires into the wiring duct yourself). When you are done, switch to test run and operate it with power on, then submit for grading: the assessment sheet lists the demerits and where they are.

Full instructions: How to use

Practice this task →