Station 2, Task 1: motor forward/reverse control circuit with wye-delta starting
This page covers the sequence of operation, the time limit and the materials of Station 2 (Task 1: forward/reverse, Y-△) of the Taiwan Level B interior wiring technician practical exam. On this site you can practice wiring, crimping and a test run in the browser following the circuit diagram and the arrangement drawing, with automatic grading against the assessment sheet.

Sequence of operation (動作說明)
- 1Power on
The green lamp lights.
- 2Press FWD
MCF and MCS operate, the motor starts forward in wye connection and the yellow lamp lights.
- 3TR times out
MCS releases and MCD operates, switching to delta running; the red lamp lights and the yellow lamp goes out.
- 4Press OFF
It stops.
- 5Press REV
It runs in reverse with the same wye-delta starting.
- 6TH-RY trips on overload
The buzzer sounds and the green lamp lights.
MCF and MCR form a reversing contactor with a mechanical interlock, and the circuit also needs an electrical interlock.
Workmanship rules
The dashed part of the main circuit on the circuit diagram (TB1 → NFB → MCF, MCF ↔ MCR, MCF → TH-RY) is pre-wired at the test site. Candidates wire the rest of the main circuit (5.5 mm² black), the control circuit (1.25 mm² yellow, all in the wiring duct) and the ground wire (8 mm² green). Wire ends at terminal blocks, ground bars and main circuit terminals must have crimp terminals; wires between the enclosure body and the enclosure door go through TB3 and TB4.
Time limit and materials
Time limit: 90 min
Wire and crimp terminals issued to candidates
From the official list of materials issued to candidates; the test site gives more when you run out.
| Name | Specification | Quantity |
|---|---|---|
| Crimp terminal | 8mm²-5, "O" | 4 pcs |
| PVC-insulated wire | 600V, 1.25mm², yellow | 1 roll |
| PVC-insulated wire | 600V, 5.5mm², black | 5 m |
| PVC-insulated wire | 600V, 8mm², green | 1 m |
| Crimp terminal | 1.25mm²-4, "Y" | 50 pcs |
| Crimp terminal | 5.5mm²-5, "Y" | 36 pcs |
Devices installed at the test site
| Name | Specification | Quantity |
|---|---|---|
| Molded-case circuit breaker | 3P, 220V, 100AF, 75AT, IC10kA | 1 pcs |
| D-type fuse | 500V, 2A, with fuse base | 2 pcs |
| Contactor | AC 220V 5.5kW(7.5HP), coil 220V 3P, auxiliary contacts 2a2b | 1 pcs |
| Contactor | AC 220V 7.5kW(10HP), coil 220V 3P, auxiliary contacts 2a2b | 1 pcs |
| Reversing contactor | AC 220V 11kW(15HP), coil 220V 3P, auxiliary contacts 2a2b, 2 units, reversing, mechanical interlock | 1 set |
| Thermal overload relay | 24A, adjustable, 3-heater | 1 pcs |
| Time-delay relay | AC 220V, wye-delta type, 0-30sec time-delay contact 1c, with socket | 1 pcs |
| Pushbutton switch (green) | 30mmφ, 600V, 1a1b | 2 pcs |
| Pushbutton switch (red) | 30mmφ, 600V, 1a1b | 1 pcs |
| Indicator light (red) | AC 220V/15V, 18V bulb, 30mmφ | 1 pcs |
| Indicator light (yellow) | AC 220V/15V, 18V bulb, 30mmφ | 1 pcs |
| Indicator light (green) | AC 220V/15V, 18V bulb, 30mmφ | 1 pcs |
| Buzzer | AC 220V, 30mmφ, flush-mount | 1 pcs |
| Terminal block | 3P, 600V, 50A | 1 pcs |
| Terminal block | 8P, 600V, 30A | 1 pcs |
| Terminal block | 16P, 600V, 20A | 2 pcs |
| Equipment ground bar (接地線端子板) | copper, 5P | 1 pcs |
| Main ground bar (接地極端子板) | copper, 4P | 1 pcs |
| Three-phase induction motor | 15HP, 6 leads (candidate workstation equipment) | 1 unit |
Practicing this task here
TR: 8-pin socket (②⑦ supply, ⑧ common, ⑤ Y, ⑥ △, ①③ instantaneous); press −/+ on the TR to set the seconds.
Open the simulator, pick this task and click terminals to wire it (normal mode routes wires automatically; in realistic mode you strip the wires, crimp the terminals and pull the wires into the wiring duct yourself). When you are done, switch to test run and operate it with power on, then submit for grading: the assessment sheet lists the demerits and where they are.