STATION 2 · Q4
Station 2, Task 4: sewage pump manual/auto alternating and abnormal-level parallel operation control circuit
This page covers the sequence of operation, the time limit and the materials of Station 2 (Task 4: sewage pumps, alternating + abnormal-level parallel operation) of the Taiwan Level B interior wiring technician practical exam. On this site you can practice wiring, crimping and a test run in the browser following the circuit diagram and the arrangement drawing, with automatic grading against the assessment sheet.

Sequence of operation (動作說明)
- 1Turn COS to manual
Pushbuttons start and stop the two sewage pumps separately.
- 2Turn COS to auto; the level rises to BS1
The conductive level controller 61F-G2 runs one pump.
- 3The level falls
The pump stops and the alternating relay (61F-APN2; a ratchet relay may be used instead) switches, so the other pump runs next time.
- 4The level keeps rising to BS2 (abnormal level)
Both pumps run in parallel and the yellow lamp lights.
- 5The level falls below BS1
Both pumps stop together.
Workmanship rules
Indicator lamps: RL1 and RL2 running, GL1 and GL2 stopped, YL abnormal level; the buzzer sounds on TH-RY overload. The supply comes in through NFB3 and branches to NFB1 and NFB2 (pre-wired at the test site), and the control supply is taken from the load side of NFB3; candidates wire the main circuit from NFB to MC and from TH-RY to the terminal blocks (3.5 mm² black), the control circuit (1.25 mm² yellow) and the ground wires.
Time limit and materials
Time limit: 90 min
Wire and crimp terminals issued to candidates
From the official list of materials issued to candidates; the test site gives more when you run out.
| Name | Specification | Quantity |
|---|---|---|
| PVC-insulated wire | 600V, 1.25mm², yellow | 1 roll |
| PVC-insulated wire | 600V, 3.5mm², black | 3 m |
| PVC-insulated wire | 600V, 5.5mm², green | 0.5 m |
| PVC-insulated wire | 600V, 3.5mm², green | 1 m |
| PVC-insulated wire | 600V, 2mm², green | 1 m |
| Crimp terminal | 1.25mm²-4, "Y" | 50 pcs |
| Crimp terminal | 5.5mm²-5, "O" | 2 pcs |
| Crimp terminal | 3.5mm²-5, "O" | 6 pcs |
| Crimp terminal | 2mm²-5, "O" | 4 pcs |
| Crimp terminal | 3.5mm²-5, "Y" | 30 pcs |
Devices installed at the test site
| Name | Specification | Quantity |
|---|---|---|
| Molded-case circuit breaker | 3P, 220V, 50AF, 30AT, IC5kA | 2 pcs |
| Molded-case circuit breaker | 3P, 220V, 50AF, 40AT, IC5kA | 1 pcs |
| D-type fuse | 500V, 2A, with fuse base | 2 pcs |
| Contactor | AC 220V 3.7kW(5HP), coil 220V 3P, auxiliary contacts 2a2b | 2 pcs |
| Auxiliary relay | AC 220V, 5A, 2C, with socket | 1 pcs |
| Thermal overload relay (starter-mounted) | 15A, adjustable, 2-heater | 2 pcs |
| Pushbutton switch (green) | 30mmφ, 600V, 1a1b | 2 pcs |
| Pushbutton switch (red) | 30mmφ, 600V, 1a1b | 2 pcs |
| Selector switch | 30mmφ, 1a1b, 600V, maintained, 2-position | 1 pcs |
| Indicator light (green) | AC 220V/15V, 18V bulb, 30mmφ | 2 pcs |
| Indicator light (red) | AC 220V/15V, 18V bulb, 30mmφ | 2 pcs |
| Indicator light (yellow) | AC 220V/15V, 18V bulb, 30mmφ | 1 pcs |
| Buzzer | AC 220V, 30mmφ, flush-mount | 1 pcs |
| Terminal block | 3P, 600V, 30A | 1 pcs |
| Terminal block | 4P, 600V, 30A | 2 pcs |
| Terminal block | 6P, 600V, 20A | 1 pcs |
| Terminal block | 20P, 600V, 20A | 2 pcs |
| Terminal block | 12P, 600V, 20A | 1 pcs |
| Conductive level controller | AC 220V, two-circuit type, with electrode rods (61F-G2) | 1 set |
| Alternating relay | AC 220V, 2c (61F-APN2; a ratchet relay may be substituted) | 1 set |
| Mercury float switch | 600V, 1a, tilt type | 2 set |
| Main ground bar (接地極端子板) | copper, 4P | 1 pcs |
| Equipment ground bar (接地線端子板) | copper, 5P | 1 pcs |
| Three-phase induction motor | 5HP, 3 leads (candidate workstation equipment) | 2 unit |
Practicing this task here
New devices in Task 4: 61F-G2 two-circuit type conductive level controller (socket pre-wired to the vertical TB5 on the right; you wire the right column of TB5; relay No. 1 follows E1, relay No. 2 follows E4), 61F-APN2 alternating relay (8-pin, alternates the two pumps), and the sewage pit mercury float switches BS1 and BS2 (tilted up: closed, hanging down: open; leads pre-wired to TB7). Power enters NFB3; NFB1–3 can be switched individually on the panel; in the test run controls you can set the sewage pit level and sewage inflow (at the test site, the float angle is changed by hand).
Open the simulator, pick this task and click terminals to wire it (normal mode routes wires automatically; in realistic mode you strip the wires, crimp the terminals and pull the wires into the wiring duct yourself). When you are done, switch to test run and operate it with power on, then submit for grading: the assessment sheet lists the demerits and where they are.